Saturday 22 March 2014

Ballast, Ballast, Ballast!

Spent the previous year concreting 5 tons of steel punching into the bilges. First I fiberglassed each pocket and then drilled reinforcing rod through the floors.


 I have left it to dry out over the Summer.
Plywood caps ready to be glassed over the top.

No comments:

Post a Comment